How we work

What happens between your first message and the day you move in, and what is worth thinking about before you start.

Step by step

Five steps to a finished building

  1. Your first message

    Tell us what the building is for, roughly how big you are thinking, and where you are. A few photos of the spot in the garden help a great deal.

  2. A closer look

    We talk it through with you and look at the garden: the ground, the access, the light and how the building will sit.

  3. Design and price

    We draw the building and give you a clear, written price for that design. Change what you like until it is right.

  4. Base and build

    We prepare the ground and lay the base, then build the frame, the roof, the cladding, the doors and the windows.

  5. Finish and hand over

    Insulation, linings, floors and the finishing details. Then we walk you round it, and it is yours.

Designing it

What we think about with you

A good garden building is mostly decisions made early. These are the ones we work through with you at the design stage, so there are no surprises once the build starts.

  • Where it sits, and how far from your boundaries
  • The base the ground needs
  • Height, size and the shape of the roof
  • Insulation, glazing and doors
  • Cladding and roof finish
  • Power, lighting and heating
What we think about with you

Before you start

Questions worth asking now

Do I need planning permission?

Many garden buildings come under permitted development, which means no planning application, but the rules depend on the height of the building, how close it is to the boundary, where it is in the garden and what it is used for. Listed buildings, flats, maisonettes and conservation areas have their own rules. We go through this with you while we design the building, and if an application is needed, we will tell you.

What about building regulations?

Building regulations can apply too, depending mainly on the size of the building, how close it is to the house and the boundary, and whether anyone will sleep in it. We look at this at the design stage as well.

What if my garden is hard to get to?

Tell us early. Most gardens can be reached with some planning, but a narrow side passage, steps or a long carry changes how the materials arrive and how the build is planned. Photos of the route in from the road are a great help.

Can you add electricity?

Yes. We plan the power, lighting and heating into the design, so the cables and fittings go in at the right stage of the build. The electrical connection to your house is done by a qualified electrician.

What do I need to do before the build?

Clear the area where the building will go and the route in, and let us know about anything under the ground that you know of, such as drains, pipes or cables. We will tell you anything else that is needed for your build.

Ready for the first step?

Send us a message about the building you have in mind. A few photos of the garden help.